Holiday Inn Daytona

Holiday Inn Daytona
  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7

BBMK handled the emergency reconstruction due to flooding on the top floor.  40 plus rooms were affected by the flooding.  BBMK restored all rooms while the rest of the building remained fully occupied.  BBMK’s staff was retained to shrink the time frame of the construction schedule.  This project was successfully completed prior to the major race event in the market.

24/7 Availability! Call Us Toll Free @ 1 (877) 622-2985